Tourbillon

11A Route de la Galaise
CH-1228
Plan-les-Ouates
Switzerland
LOCATION
Plan-les-Ouates
,
Switzerland
Type
Interior design
YEAR
2022
SURFACE
2500m2

Development of a training center for technical building trades

Purpose of the project
Creation, at the Espace Tourbillon, of a common training center dedicated to the inter-company courses (CIE) of the technical building trades:

Tinsmiths - Heating installers - Sanitary installers - Metal builders

The MBG Joint Training Center is located in Building A of the Espace Tourbillon, on a total area of2100m2 located on the first floor (metal builders) and on the fifth floor (heating installers, tinsmiths, sanitary installers and administration). In addition, there are 230m2 in the basement for storage space. ‍‍

Program

Development of a training center for technical building trades

Location

Geneva, Switzerland

Type 

Interior design

Partner

CFC MBG

Charge 

100% SIA

Status

Delivered December 2022

The Tourbillon space offers a particularly efficient delivery management: An access to the 2nd basement for 38T trucks (semi-trailer type) allows to supply the whole building with material, accessible at each floor by 4000kg elevators. Our project consisted in setting up collective workshop spaces (for 12 to 20 apprentices) on a rough surface, only equipped with heating and ventilation installations. These workshops accommodate apprentices for the entire apprenticeship program.
From the point of view of the organization of space: the project concentrates the spaces annexed to the workshops (storage rooms, checkrooms, sanitary rooms, technical) on the central part of the premises, in order to free up the spaces close to the façades for the workshops and activities. This layout allows for maximum use of natural light in the students' work areas. Large open areas allow for flexibility in the layout of the building according to the level of education during the 4 years of learning. The construction principle, with the use of sandstone walls, is adapted to the use of the spaces as workshops, guaranteeing a resistance linked to the activity. For the office area, classrooms and cafeteria, light partitions were installed, ensuring acoustic comfort and speed of execution.
Une adaptation importante des installations techniques existante a été nécessaire pour répondre aux exigences strictes des activités professionnelles. Des locaux gaz ont été aménagés au rez-de-chaussée pour alimenter les 4 ateliers. Des ballons thermodynamiques (type de pompe à chaleur), assurent l’eau chaude sanitaire. Les box de travail pour les élèves ont été réalisés en structures métalliques en acier inoxydable et panneaux bois. Chaque box est équipé de tous les installations nécessaires pour l’apprentissage. (gaz, électricité, eau,..)

Video

Les chiffres A

REFERENCE
-
TOTAL SURFACE
2500m2
LEVEL
3
YEAR
2022
Atelier A architects develops its projects in Switzerland in collaboration with a multidisciplinary team and qualified agents in each field of activity (building technology, acoustics, fire protection, etc.) in order to guarantee authentic, controlled projects.  